top of page

Wednesday, February 8, 2023


A. Take 15 minutes to complete the following:

    A1. Build to a heavy single push press 

 right into 

    A2. build to a heavy single push jerk 

B. For time 

15 shoulder to overhead @ 77% of heavy single Push press from part A

30 Wall ball 20#/14#

12 s2oh

24 pull-ups

9 s2oh

18 wall ball 20#

6 s2oh

12 pull-ups

3 s2oh

15 minute time cap


Masters

A. Take 12 min to complete 3 sets of the following:

    A1. SL KB/DB Romanian deadlifts @ 30X1 x 8-10/leg

     A2. Renegade rows x 10/arm

     A3. AMRAP DB bench press in 45sec

B. 10 min AMRAP

     16 SA Db alt snatches

     12 single DB step ups

      8 burpees over DB

139 views0 comments

Recent Posts

See All

A. Take 12 minutes to complete 3 sets of the following A1. Front rack reverse lunge x16-20 reps; building load from 95#/65# A2. Strict Mixed grip pull-up  x 4-6.4-6 reps (switch grip after first clust

5 rounds for time w/a partner 30/20 cal EB 30 Box Jump Overs 24,20 30 alternating push-ups 30 Back Squats 115,75

A. EMOM 5 min 1 Slow to knee snatch pull + 1 Slow to knee Power Snatch B. EMOM 5 min 1 Snatch Pull + 1 Below knee hang power Snatch -building load from 95#/65# if perfect B. 10 minute AMRAP 6 strict H

bottom of page